|


770.891.6437 Frank Ors
sales@expresslaundries.com
Fax: (770) 979-3535
 |
E-Series Washers
Pro-Series Washers
L-Series Washers
Econ-O-Washers
Pro-Series Soft-Mount Washers For
On-Premise Laundries
• Pro-Series Installation • Pro-Series Performance • Pro-Series Productivity • Pro-Series Specs •
More than
90% of the costs associated with laundry room productivity can be
positively impacted by Continental's Pro-Series High Performance
Washers*. Here's how:
Labor (50-60%) Labor is the
single largest cost of an on-premise laundry!
- Quick installation allows for immediate
production, virtually no time is lost.
- High G-force extraction reduces time lost due
to bottlenecks created at the dryer, as well as shorter wash cycle
times.
- Features on the PM Control such as auto
programming and delayed start can significantly reduce labor
expenses.
Linen Replacement
(8-12%)
- Reduced dry time due to high G-force extraction
decreases linen damage and resulting linen replacement costs.
- The controllable wash time feature on the PM
Control protects linen from unnecessary processing and chemical
exposure, further increasing linen life.
Chemicals (7-10%)
- The thermostatically controlled temperature and
programmable fill levels using the PM Control allow you to control
wash variables that can significantly reduce chemical consumption
and cost.
Utilities (7-10%)
- High G-force extraction reduces dry time and
therefore cuts the utility consumption associated with drying.
- Programmable fill levels and no-sump design
reduce water/sewer volume and related costs.
|
|
Equipment Replacement (6-9%)
- The soft-mount design and suspension system
reduce the amount of stress on the machine, therefore increasing
the life of the washer.
- Reduced dry time dramatically extends the life
of drying tumblers.
Other (4-7%)
Maintenance, Insurance, Financing
- No on-going maintenance concerns relating to
anchor bolts and concrete.
- The PM Control provides self diagnostics for
easy servicing.
- Continental's 5/3 year limited warranty assures
operational cost control.
|
 |
|
|